How Much Concrete Do I Need for a Patio?

A patio is a flat slab with one decision that matters: how thick. The chart below gives yards, bags and the order quantity for the patio sizes people actually pour, at the standard 4 inches and at 6 inches for heavy use.

Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.

The short answer: area × thickness, then add 10%

A patio is a rectangular slab, so the volume is cubic yards = length (ft) × width (ft) × thickness (in) ÷ 324 — the same formula the Concrete Calculator uses. Add the standard 10% waste allowance for an uneven sub-base and spillage, then round the order up to the next quarter yard, because ready-mix is sold in quarter-yard steps. For bags, divide the with-waste cubic feet by 0.60 — the yield of an 80 lb bag — and round up. Our guide to how much concrete you need covers the same formula for slabs in general; this guide is about the patio itself — its size, its thickness, and the shapes that are not rectangles.

How thick should a patio be?

4 inches is the standard for a patio that carries people, chairs and a grill — the same as a sidewalk — and it is what the chart below assumes. Go to 5 inches for a heavy outdoor kitchen, a large stone fireplace or a patio that will carry a loaded wheelbarrow of firewood every week. Pour 6 inches where the patio carries real weight: a hot tub, a vehicle, or a section that doubles as a driveway crossing (our sidewalk guide pours its driveway crossings at 6 inches for the same reason). Under the slab, put 4 inches of compacted gravel base — our guide to how thick gravel should be covers the base depths — and if the patio is thicker at the edges, count the thickened edge separately: a 4-inch slab with a 12-inch-deep edge beam around the outside takes noticeably more concrete than the flat-slab figure, and the calculator's slab mode does not include it. For the slab thickness itself, see our guide to how thick a concrete slab should be.

Concrete for common patio sizes (4 inches thick)

The table is for a 4-inch-thick patio with the 10% waste allowance included. The "order" column rounds up to the next quarter yard, and the bag column counts 80 lb bags from the with-waste volume. For a 6-inch patio, multiply the yards and the bags by 1.5 — the worked 16×20 example below shows it.

Patio sizeNet cubic yardsOrder (with 10% waste)80 lb bags
8 × 8 ft0.791.00 yd³40
10 × 10 ft1.231.50 yd³62
12 × 12 ft1.782.00 yd³88
12 × 16 ft2.372.75 yd³118
10 × 20 ft2.472.75 yd³123
14 × 18 ft3.113.50 yd³154
16 × 20 ft3.954.50 yd³196
20 × 20 ft4.945.50 yd³245

Two things the table makes plain. First, a patio crosses the bag-to-truck line fast: a 10×10 is a bag job if you are determined, but a 16×20 at 196 bags is a truck job by any measure. Second, the waste allowance is not padding — a patio poured on a gravel base that is an inch low in places drinks the extra 10% before the pour is half done.

Worked examples

A 12 × 16 ft patio at 4 inches — the common backyard size. The volume is 12 × 16 × 4 ÷ 324 = 2.37 cubic yards. With 10% waste that is 2.61 yards, so order 2.75 cubic yards. In bags that is 2.61 × 27 = 70.4 cu ft, and 70.4 ÷ 0.60 = 117.3, so 118 bags of 80 lb mix. At the site's rough ready-mix range of $125–$180 per cubic yard, the truck costs 2.75 × $125–$180 = $344–$495, against 118 × $7 = $826 in bags — the truck wins by a wide margin, and 118 bags is a full day of mixing by hand.

A small 10 × 10 ft patio at 4 inches. The volume is 10 × 10 × 4 ÷ 324 = 1.23 cubic yards. With 10% waste that is 1.36 yards, so order 1.50 cubic yards, or 62 bags (36.7 cu ft ÷ 0.60 = 61.1, rounded up). The truck costs 1.50 × $125–$180 = $188–$270 against 62 × $7 = $434 in bags — but watch the short-load fee: most suppliers charge extra under about 3 yards, so a 1.5-yard order can carry a $50–$150 fee on top. Even with the fee, the truck is usually cheaper, and it is incomparably less work. Our guide to bagged concrete vs ready-mix works out the crossover in detail.

A round patio, 12 ft across, at 4 inches. The area is π × 6² = 113.10 sq ft, so the volume is 113.10 × 4 ÷ 324 = 1.40 cubic yards. With 10% waste that is 1.54 yards, so order 1.75 cubic yards, or 70 bags (41.5 cu ft ÷ 0.60 = 69.1, rounded up). Measure the diameter through the centre of the circle, not across a chord, and form the circle with flexible form boards — a round patio is measured the same way as the round bed in our raised-bed topsoil guide.

An L-shaped patio: 20 × 16 ft overall with an 8 × 6 ft corner missing, at 4 inches. Split it into rectangles and count the corner once: the area is 20 × 16 − 8 × 6 = 320 − 48 = 272 sq ft. The volume is 272 × 4 ÷ 324 = 3.36 cubic yards. With 10% waste that is 3.69 yards, so order 3.75 cubic yards, or 167 bags (99.7 cu ft ÷ 0.60 = 166.2, rounded up). Our guide to measuring an L-shaped room uses the same split-into-rectangles method — the corner belongs to one leg or the other, never both.

A heavy-use 16 × 20 ft patio at 6 inches, for a hot tub. The volume is 16 × 20 × 6 ÷ 324 = 5.93 cubic yards. With 10% waste that is 6.52 yards, so order 6.75 cubic yards, or 294 bags (176.0 cu ft ÷ 0.60 = 293.4, rounded up). At 6 inches the same footprint takes half as much again as at 4 inches — which is why thickness is decided before the order is placed, not after the truck arrives. A hot tub also wants the slab reinforced and the ground properly compacted; the concrete quantity is the easy part of that job.

Control joints — the part that stops the cracking

Concrete shrinks as it cures, and a patio without joints cracks wherever it pleases. Control joints give it a planned place to crack: a groove cut or tooled across the slab at regular intervals, about a quarter of the slab's depth (1 inch deep on a 4-inch patio). Space them no more than 2–3 times the thickness in inches, in feet — 8–12 ft apart for a 4-inch slab, the same rule our driveway guide uses. On a patio, the practical spacing is usually tighter: a 12×16 patio with joints every 8 ft reads as four tidy panels, while a 16 ft run with no joint reads as a crack waiting to happen. Tool the joints while the concrete is still workable, or saw-cut them the same day — a joint cut a week later is a decoration, not a control joint.

Bags or a truck?

The crossover is about 1 cubic yard — 45 bags of 80 lb mix, roughly $315 in bags against $125–$180 a yard from a truck. Below a yard, bags can be cheaper once delivery is counted; above it, the truck wins on price and overwhelmingly on labour. The catch for patios is the short-load fee: most suppliers charge extra for orders under about 3 cubic yards. A 1.5-yard patio might carry a $50–$150 fee on top of the per-yard price — ask the supplier before ordering. Even with the fee, the 10×10 patio above costs $188–$270 plus the fee against $434 in bags, and the concrete arrives mixed, in one pour, instead of 62 bags into a wheelbarrow.

Common mistakes

  1. Ordering the net volume. The 12×16 patio needs 2.37 yards net and 2.61 with waste, and the truck is ordered at 2.75. Ordering exactly 2.37 runs out a few feet from the end.
  2. Measuring the outside of the forms. Measure the inside of the forms — the concrete goes inside them. An inch of formwork on each side overstates a 12 ft patio by over 4%.
  3. Pouring 4 inches under a hot tub. A hot tub is thousands of pounds on a small footprint. Pour its pad at 6 inches, reinforced, or pour a separate thicker pad under it.
  4. Forgetting the thickened edge. A patio with a deep edge beam takes more concrete than the flat-slab figure. Count the edge separately.
  5. Spacing the joints too far apart. Joints belong no more than 8–12 ft apart on a 4-inch patio. A 20 ft run with one joint will crack between them.
  6. Skipping the gravel base. Four inches of compacted gravel under the slab stops the patio settling and cracking. Concrete on soft soil is a temporary patio.

Frequently Asked Questions

How much concrete do I need for a 12x16 patio?

A 12×16 ft patio at 4 inches thick takes 2.37 cubic yards net — order 2.75 cubic yards with the 10% waste allowance, or 118 bags of 80 lb mix. At 6 inches thick the same patio takes 3.56 yards net, so order 4.00 yards or 176 bags.

How thick should a concrete patio be?

4 inches for a patio that carries people, chairs and a grill, on a 4-inch compacted gravel base. Pour 5 inches for a heavy outdoor kitchen and 6 inches where the patio carries a hot tub or a vehicle.

How many bags of concrete for a patio?

Divide the with-waste cubic feet by 0.60 (the yield of an 80 lb bag). A 10×10 ft patio at 4 inches takes 62 bags; a 12×16 takes 118; a 16×20 takes 196 — at that size, order ready-mix instead.

Is it cheaper to use bags or ready-mix for a patio?

Ready-mix is cheaper above about 1 cubic yard: a 12×16 ft patio costs roughly $344–$495 from a truck (2.75 yards at $125–$180 per yard) against $826 in bags — plus a possible short-load fee under about 3 yards, so ask the supplier. Below a yard, bags can win once delivery is counted.

How far apart should control joints be on a patio?

No more than 2–3 times the thickness in inches, in feet — 8–12 ft apart for a 4-inch patio. In practice, joints every 8 ft give tidy panels on a 12×16 patio and control cracking better than the outer limit.