Bagged Concrete vs Ready-Mix: Which Should You Use?
Bags win under about half a cubic yard; a ready-mix truck wins over about a yard — a 10×10 ft patio takes 56 bags (about $392) or a truck at about $185 plus delivery.
Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.
The short answer: bags under half a yard, truck over a yard
If the job is under about half a cubic yard — a few fence posts, a small pad, a repair — buy bags. If it is over about one cubic yard — a patio, a driveway, a foundation — order a ready-mix truck. Between half a yard and a yard, price both: the delivery and short-load fee on the truck, against the labour of mixing dozens of bags by hand. Strength is not the decider — a correctly mixed bag reaches its psi rating just like truck concrete. Labour, consistency and cold joints are.
Use the Concrete Calculator for the volume and the Concrete Bag Calculator for exact bag counts on any size — the table below covers the common ones.
What is bagged concrete?
Bagged concrete is pre-mixed dry cement, sand and aggregate sold in 40, 50, 60 and 80 lb bags at any home center. You add water, mix it in a wheelbarrow or a rented drum mixer, and place it. An 80 lb bag yields 0.60 cubic feet of concrete; a 60 lb bag yields 0.45 cubic feet — the same yields printed on the QUIKRETE data sheet and used across this site's calculators. There is no delivery to schedule and no clock running: you mix one bag at a time, on your own schedule, and a half-used bag keeps for the next weekend.
The catch is scale. One cubic yard is 45 bags of 80 lb mix — 3,600 lb of dry material lifted twice (once into the mixer, once into the form), mixed in batches, and placed before the first batch starts to set. That is the whole decision in one number.
What is ready-mix?
Ready-mix concrete is batched at a plant and delivered by truck, already mixed. You specify the volume, the strength (psi) and the slump (how wet it flows), and the truck arrives with the whole order at once — a 10×10 patio pours in under an hour instead of a day of mixing. Most plants have a minimum order of about one cubic yard, and orders under roughly 3–4 cubic yards usually carry a short-load fee on top of the per-yard price — sometimes roughly the price of another yard — which is why small truck orders can cost more than the per-yard price suggests.
The clock is the trade-off: once the truck arrives you have about 90 minutes of working time before the concrete starts to set, so the forms, the crew and the tools must be ready before it pulls in.
The cost crossover — worked examples
Bag prices are rough 2026 US planning numbers ($7 per 80 lb bag in the table; the range is $4.50–$9 depending on brand and region). Ready-mix is priced at $150 per cubic yard, the middle of the $125–$180 range from our concrete guide, before delivery and any short-load fee. Every volume below is hand-checked against the site's own calculators.
| Project | Volume | Bags (80 lb) | Bags cost @ $7 | Ready-mix @ $150/yd³ | Winner |
|---|---|---|---|---|---|
| Fence post hole, 12 in dia × 36 in deep | 2.36 cu ft (0.09 yd³) | 4 | ≈ $28 | $150/yd³ + delivery — not worth a truck | Bags |
| Small pad / repair | ½ yd³ (13.5 cu ft) | 23 | ≈ $161 | ≈ $75 + delivery / short-load fee | Bags, unless the fee is small |
| One cubic yard | 1 yd³ (27 cu ft) | 45 | $315 | $150 + delivery | Depends on the delivery fee |
| 10×10 ft patio, 4 in thick | 1.23 yd³ (33.3 cu ft) | 56 | ≈ $392 | ≈ $185 + delivery | Ready-mix, unless the fee is steep |
| 20×20 ft driveway, 5 in thick | 6.17 yd³ (167 cu ft) | 278 | ≈ $1,946 | ≈ $926 + delivery | Ready-mix, by a lot |
The crossover sits where the truck's fixed costs stop dominating. At one cubic yard, bags cost $315 in materials against $150 of ready-mix plus delivery — if the delivery and short-load fee together come to less than about $165, the truck wins even at one yard. At half a yard the bags cost $161 against $75 of concrete plus fees, so bags usually win. At two yards the gap is decisive: about $700–$800 of bags against $250–$350 of ready-mix plus delivery. For most DIYers pricing their own labour at zero, the practical crossover is around 1–1.5 cubic yards; for a contractor paying a crew, it is often below one yard, because the crew's mixing time costs more than the truck's fee.
How many bags is a cubic yard, and what does it cost?
One cubic yard is 27 cubic feet. At 0.60 cubic feet per 80 lb bag, that is exactly 45 bags; at 0.45 per 60 lb bag, 60 bags. The material-only cost per yard of bags, at common US bag prices, is:
| Bag price (80 lb) | Cost per cubic yard (45 bags) | Ready-mix per cubic yard |
|---|---|---|
| $5 | $225 | $125–$180 |
| $7 | $315 | $125–$180 |
| $9 | $405 | $125–$180 |
Even at the cheapest bag price, bagged concrete costs roughly double ready-mix per yard in materials alone — before counting the hours of mixing. Bags win on small jobs because a truck's delivery and short-load fee are fixed costs spread over very little concrete, not because the bags themselves are cheap.
The shared numbers: slab sizes and coverage
Every bags-vs-truck comparison on this page starts from the same two tables the concrete calculator uses — the slab sizes first:
| Slab size | Area | Cubic feet | Cubic yards | Cu yd with 10% waste | 80 lb bags | 60 lb bags |
|---|---|---|---|---|---|---|
| 4 × 4 ft | 16 sq ft | 5.33 | 0.20 | 0.22 | 9 | 12 |
| 6 × 6 ft | 36 sq ft | 12.00 | 0.44 | 0.49 | 20 | 27 |
| 8 × 8 ft | 64 sq ft | 21.33 | 0.79 | 0.87 | 36 | 48 |
| 8 × 10 ft | 80 sq ft | 26.67 | 0.99 | 1.09 | 45 | 60 |
| 10 × 10 ft | 100 sq ft | 33.33 | 1.23 | 1.36 | 56 | 75 |
| 10 × 12 ft | 120 sq ft | 40.00 | 1.48 | 1.63 | 67 | 89 |
| 12 × 12 ft | 144 sq ft | 48.00 | 1.78 | 1.96 | 80 | 107 |
| 12 × 16 ft | 192 sq ft | 64.00 | 2.37 | 2.61 | 107 | 143 |
| 16 × 16 ft | 256 sq ft | 85.33 | 3.16 | 3.48 | 143 | 190 |
| 20 × 20 ft | 400 sq ft | 133.33 | 4.94 | 5.43 | 223 | 297 |
| 20 × 30 ft | 600 sq ft | 200.00 | 7.41 | 8.15 | 334 | 445 |
| 24 × 24 ft | 576 sq ft | 192.00 | 7.11 | 7.82 | 320 | 427 |
And the coverage each yard buys at each thickness:
| Thickness | Sq ft one cubic yard covers | Sq ft one 80 lb bag covers |
|---|---|---|
| 3 in | 108 | 2.4 |
| 4 in | 81 | 1.8 |
| 5 in | 64.8 | 1.44 |
| 6 in | 54 | 1.2 |
| 8 in | 40.5 | 0.9 |
Quick answers for other slab sizes
Bagged or ready-mix for an 8×8 slab?
At 4 inches thick, an 8 × 8 ft slab is 21.33 cu ft — 36 bags of 80-lb mix, or 0.79 cubic yards. Bags win: a truck order this small is below most plants' minimum and carries a short-load fee.
Bagged or ready-mix for a 10×20 slab?
At 4 inches thick: 66.67 cu ft = 2.47 cubic yards, or 112 bags. Ready-mix wins — 112 bags is about 9,000 lb of dry mix to lift and mix.
Bagged or ready-mix for a 12×20 driveway?
At 4 inches thick: 80 cu ft = 2.96 cubic yards — order 3.5 yards — or 134 bags. A truck job; at 5–6 inches thick it is not close.
Bagged or ready-mix for a 30×30 slab?
At 4 inches thick: 300 cu ft = 11.11 cubic yards — more than one truckload — or 500 bags. The question answers itself.
Is bagged concrete as strong as ready-mix?
Yes — mixed correctly to the same rating. A bag of 4,000 psi mix, mixed with the right amount of water, reaches 4,000 psi just like a truck load of 4,000 psi ready-mix. The failure mode for bags is not the bag, it is the mixing: overwatering is the classic mistake — extra water makes the mix easier to pour but weakens the cured concrete, increases shrinkage and cracking, and can leave a bag mix well short of its psi rating. Follow the water quantity printed on the bag, not the look of the mix.
The other quality risk at volume is cold joints: mixing 45 bags by hand means the first batch has started to set before the last is placed, and the seam between them is a weak plane in the finished slab. A truck pours the whole slab at once, so there is no seam. That is the real quality argument for ready-mix above about a yard — not strength, but consistency.
When bags win
- Fence posts and small pads. A post hole takes about 4 bags of 80 lb mix — $28 of material and no truck to schedule. See the Concrete Bag Calculator post-hole mode for exact counts.
- Repairs. Two bags patch a step or a cracked corner; a truck minimum makes no sense for two bags' worth.
- Work spread over days. Bags let you pour one section this weekend and the next one later, with no 90-minute clock and no short-load fee per visit.
- Where a truck cannot reach. A back garden with a narrow gate, a steep slope or no driveway access — bags go through in a wheelbarrow where a truck cannot.
- Under about half a cubic yard. The truck's fixed delivery and short-load costs outweigh the bags' higher per-yard price.
When ready-mix wins
- Driveways, slabs and foundations. Anything over about a cubic yard: the 20×20 ft driveway above is 278 bags against one truck — a full day of mixing versus under an hour of pouring.
- A specified strength. Bags top out around 4,000 psi mixes; a ready-mix plant supplies any specified strength, slump and admixture (air entrainment for freeze-thaw, for example).
- It all has to arrive at once. A slab poured in one continuous placement has no cold joints and a uniform finish.
- You are paying a crew. Mixing labour is the hidden cost of bags — roughly 2–3 hours of mixing per cubic yard for one person with a drum mixer. A crew standing around a wheelbarrow costs more than the truck's fee.
How many bags is too many?
Count the labour, not just the money. One cubic yard of bags is 3,600 lb lifted twice and 2–3 hours at the drum mixer for one person; the 10×10 patio (56 bags, 4,480 lb) is a full weekend for one person and a hard day for two. The 20×20 driveway (278 bags, over 11 tons) is not a DIY bag job at all — it is a day of mixing for a crew, with cold joints guaranteed. As a rule of thumb: if you need more than about 25–30 bags (roughly half a yard), rent a drum mixer rather than a wheelbarrow; if you need more than about 45 bags (a full yard), price the truck before you buy the first bag.
Common mistakes
- Overwatering the bag mix. Extra water makes it pour easier and cure weaker. Measure the water on the bag; do not judge by eye.
- Ordering a truck for two bags' worth. The minimum order and short-load fee make a truck absurd for a post hole — the $28 bag job becomes a $200+ delivery.
- Mixing 45 bags with no mixer. A wheelbarrow and a hoe work for a handful of bags; past about half a yard, rent a drum mixer or your back and your schedule will both regret it.
- Ignoring the short-load fee in the comparison. Compare bags against ready-mix plus delivery and the short-load fee, not against the per-yard price alone — the fee is what decides the half-yard to one-yard band.
- Counting the gravel base as concrete volume. The 4 inches of compacted gravel under a slab is base, not concrete — measure only the concrete depth, or you will order a yard you do not need. See our slab thickness guide for the right depths by use.
- Pouring footings or foundations on a rule of thumb. Load-bearing work goes to local code and an engineer — this guide covers patios, pads and driveways, not structural concrete.
Frequently Asked Questions
How many 80 lb bags of concrete are in a cubic yard?
45 bags. One cubic yard is 27 cubic feet and an 80 lb bag yields 0.60 cubic feet, so 27 ÷ 0.60 = 45. At $5–$9 per bag that is $225–$405 of bags per yard, against $125–$180 per yard for ready-mix — the Concrete Bag Calculator gives exact counts for any volume, including 40, 50 and 60 lb bags.
Can I mix bags of concrete in a wheelbarrow?
Yes, for small jobs — a few bags for post holes or a repair mix fine with a hoe in a wheelbarrow. Past about half a cubic yard (around 23 bags), rent a drum mixer: it mixes faster, more evenly, and saves your back. Past a full yard, price a ready-mix truck before you start.
Does ready-mix concrete have a minimum order?
Usually about one cubic yard, and orders under roughly 3–4 cubic yards commonly carry a short-load fee on top of the per-yard price. Ask your local plant for both numbers before comparing — the fee, not the per-yard price, is what decides whether bags or a truck wins between half a yard and a yard.
What psi concrete do I need for a driveway?
3,000–4,000 psi is typical practice for a residential driveway in the US — 4,000 psi where winters freeze and thaw. Bags top out around 4,000 psi mixes; a ready-mix plant can supply any specified strength. Check local code, and see our slab thickness guide for the right depth (usually 5–6 inches for a driveway).
Is bagged concrete cheaper than ready-mix?
Per cubic yard, no — bags cost roughly $225–$405 per yard in materials against $125–$180 for ready-mix. Bags are cheaper for a whole job only when the job is small enough that the truck's delivery and short-load fee cost more than the bags' premium: under about half a cubic yard, almost always; over about a yard, almost never.
Sources and Method
The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.
- NRMCA CIP 31 — Ordering Ready-Mixed Concrete (ready-mix ordering and waste guidance).
- QUIKRETE Concrete Mix No. 1101 data sheet — published yield per bag (0.30 / 0.45 / 0.60 cu ft for 40 / 60 / 80 lb bags).
- Standard concrete density of about 150 lb per cubic foot.
- QUIKRETE Concrete Mix No. 1101 data sheet (PDF) — yield per bag: 0.30 cu ft (40 lb), 0.375 cu ft (50 lb), 0.45 cu ft (60 lb), 0.60 cu ft (80 lb); mixing water about 6 pt per 80 lb bag. Checked November 2026.