Concrete Calculator

How much concrete for a slab, pad or footing — in cubic yards for ready-mix, or bags for a mixer or wheelbarrow.

Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.

Concrete is unforgiving to estimate by eye: a slab that looks like "about a yard" can easily be a yard and a half, and running short mid-pour leaves a weak cold joint in the finished slab. This calculator turns your slab's length, width and thickness into an exact volume, then gives you the two ways concrete is actually bought — cubic yards for a ready-mix truck, and the number of 40 lb, 60 lb or 80 lb premix bags if you are mixing it yourself.

Measure the length and width of the area, decide on a thickness (4 inches is standard for patios, walkways and most residential slabs; 5–6 inches for driveways that carry vehicles), and type the numbers in. A waste allowance field is included because graded ground is never perfectly level — 5 to 10 percent extra is cheap insurance against a short load.

The shape selector also covers strip footings, round columns and post holes, and walls, and a quantity field handles repeated pieces — four identical post holes, say. Add a price per cubic yard or per bag and the calculator turns the volume into a cost estimate for both buying routes.

Concrete Calculator

Slab: length × width × thickness.

1.36 cubic yards
Order this much (rounded up to the next ¼ yard)1.50 cu yd
Volume (incl. waste allowance)36.67 cu ft (1.04 cu m)
80 lb bags of premix62
60 lb bags of premix82
40 lb bags of premix123
Total weight5,500 lb (2.75 tons)
Ready-mix trucks1 truck (trucks carry 8–10 cu yd each) — orders under about 4 cu yd usually carry a short-load fee
Ready-mix cost estimate—
Bag cost estimate (80 lb bags)—

Bag yields used: an 80 lb bag makes 0.6 cu ft of concrete; a 60 lb bag makes 0.45 cu ft; a 40 lb bag makes 0.30 cu ft — the manufacturers' published yields. One cubic yard = 27 cu ft. The order figure is your yardage including your waste allowance, rounded up to the next quarter yard — the step most suppliers deliver in. Cost estimates use the yardage and bag count including your waste allowance, and exclude delivery and short-load fees.

Quick answer: a 10 × 10 ft slab at 4 inches thick is 33.3 cu ft = 1.23 cu yd of concrete; with the standard 10% waste allowance the calculator below shows 1.36 cu yd (order 1.5), or 62 bags of 80 lb mix with waste included (82 bags of 60 lb).

How to Use This Calculator

  1. Pick the shape: slab for pads and floors, strip footing for a foundation run, round column for post holes and piers, wall for a stem or retaining wall — the note under the selector explains what each dimension means for that shape, and Quantity covers repeated pieces.
  2. Measure the length and width of the slab area in feet and inches. For an irregular pad, break it into rectangles and run the calculator once for each.
  3. Choose the thickness: 4 inches for patios, sidewalks and shed bases; 5–6 inches for driveways and anywhere a vehicle will park.
  4. Enter a waste allowance — 5% on a well-graded, level base, 10% if the ground is uneven or the forms are rough.
  5. Order ready-mix by the cubic yard figure (most suppliers round to the nearest quarter or half yard), or buy the bag count shown if you are mixing on site.

The Formula

Concrete volume is length times width times thickness, worked in feet. Thickness is given in inches, so divide it by 12 to get feet: a 4-inch slab is 0.333 ft thick. Multiply the three numbers for cubic feet, then divide by 27 — the number of cubic feet in a cubic yard — to get the ready-mix order quantity.

For bagged concrete, divide the total cubic feet by the yield of one bag. Standard published yields are 0.6 cubic feet for an 80 lb bag and 0.45 cubic feet for a 60 lb bag (a 40 lb bag yields 0.30). That means one cubic yard of concrete takes 45 bags of 80 lb mix or 60 bags of 60 lb mix — which is why anything over about half a yard is usually cheaper and far less work as a ready-mix delivery.

Cubic feet = Length (ft) × Width (ft) × Thickness (in) ÷ 12  |  Cubic yards = Cubic feet ÷ 27  |  Bags = Cubic feet ÷ bag yield  |  Round column = π × (Diameter ÷ 2)² × Height
Length — 10 ftWidth — 10 ftThickness — 4 in

How a slab is measured: volume = Length × Width × Thickness. The diagram is labelled with the default job used across this page — a 10 × 10 ft slab, 4 inches thick.

Worked Example

A 10 ft by 10 ft patio slab, 4 inches thick: the volume is 10 × 10 × (4 ÷ 12) = 33.33 cubic feet, which is 33.33 ÷ 27 = 1.23 cubic yards. A concrete supplier would typically deliver 1.25 or 1.5 yards depending on their rounding. Mixing it yourself instead would take 33.33 ÷ 0.6 = 56 bags of 80 lb mix, or 75 bags of 60 lb mix — a full pallet and a long day with a rented mixer, which is why most people order a truck for a slab this size.

Add 10% waste for uneven ground and the same slab needs 1.36 cubic yards, so ordering 1.5 yards covers the pour with a small margin for the inevitable low spots in the base.

A second example — a 12 ft by 12 ft garage pad, 4 inches thick: 12 × 12 × (4 ÷ 12) = 48 cubic feet = 1.78 cubic yards. With 10% waste that is 1.96 yards, so order 2 cubic yards — a small load, and one most suppliers will charge a short-load fee on. In bags it is 80 bags of 80 lb mix net, 89 with the waste allowance included, which is why a pad this size is normally a truck job too.

A bigger pour — a 20 ft by 20 ft driveway at 6 inches thick: 20 × 20 × (6 ÷ 12) = 200 cubic feet = 7.41 cubic yards. Add 10% waste and you get 8.15 yards, so order 8.25 cubic yards — a single full truckload, since trucks carry 8–10 yards — weighing about 33,000 lb (16.5 tons) with the waste included. The bag alternative shows why driveways are never bagged: 334 bags of 80 lb mix net, 367 with waste — over 13 tons of dry mix to haul, open and mix by hand.

Concrete for Common Slab Sizes (4 inches thick)

Slab sizeAreaCubic feetCubic yardsCu yd with 10% waste80 lb bags60 lb bags
4 × 4 ft16 sq ft5.330.200.22912
6 × 6 ft36 sq ft12.000.440.492027
8 × 8 ft64 sq ft21.330.790.873648
8 × 10 ft80 sq ft26.670.991.094560
10 × 10 ft100 sq ft33.331.231.365675
10 × 12 ft120 sq ft40.001.481.636789
12 × 12 ft144 sq ft48.001.781.9680107
12 × 16 ft192 sq ft64.002.372.61107143
16 × 16 ft256 sq ft85.333.163.48143190
20 × 20 ft400 sq ft133.334.945.43223297
20 × 30 ft600 sq ft200.007.418.15334445
24 × 24 ft576 sq ft192.007.117.82320427

Every figure in the table above is at 4 inches thick, and the bag counts are net — no waste added. For a 6-inch slab, multiply the yards and the bags by 1.5. The “with 10% waste” column is the amount to order before the supplier rounds it up to their quarter-yard step. The same sizes with waste-included bag counts for all four bag sizes are in the table further down this page.

Quick Answers for Common Slab Sizes

How much concrete do I need for a 12×12 slab?

A 12 × 12 ft slab at 4 inches thick is 48 cu ft = 1.78 cubic yards. With a 10% waste allowance that is 1.96 yards, so order 2 cubic yards. In bags it is 80 bags of 80 lb mix (107 bags of 60 lb).

How much concrete do I need for a 20×20 slab?

A 20 × 20 ft slab at 4 inches thick is 133.33 cu ft = 4.94 cubic yards; with 10% waste, 5.43 yards, so order 5.5 cubic yards. Bagging it would take 223 bags of 80 lb mix — this is a ready-mix job.

How many bags of concrete do I need for a 10×10 slab at 6 inches?

At 6 inches thick a 10 × 10 ft slab is 50 cu ft, so 84 bags of 80 lb mix (112 bags of 60 lb) — or 1.85 cubic yards of ready-mix, 2.25 yards once 10% waste is added and the order is rounded up.

How many 80 lb bags of concrete are in a cubic yard?

45 bags. One cubic yard is 27 cu ft and an 80 lb bag yields 0.6 cu ft, so 27 ÷ 0.6 = 45 bags. The same yard takes 60 bags of 60 lb mix or 90 bags of 40 lb mix.

How much concrete do I need for a 10×12 slab?

A 10 × 12 ft slab at 4 inches thick is 40 cu ft = 1.48 cubic yards — order 1.75 yards with 10% waste — or 67 bags of 80 lb mix.

How much concrete do I need for a 24×24 slab?

A 24 × 24 ft slab at 4 inches thick is 192 cu ft = 7.11 cubic yards; with 10% waste, 7.82 yards, so order 8 cubic yards — one full truck. In bags it would be 320 bags of 80 lb mix.

Bag Counts for Common Slabs — With 10% Waste Included

The slab table near the top of this page counts bags net, the way the maths works. This is the same table the way you actually buy: the standard 10% waste allowance included, for all four bag sizes. At the 10 × 10 size the count crosses a pallet of 80 lb bags (42 per pallet), which is the point where most people switch to ready-mix.

Slab (4 in thick)80 lb bags60 lb bags50 lb bags40 lb bags
4 × 4 ft10141620
6 × 6 ft22303644
8 × 8 ft40536379
8 × 10 ft49667998
10 × 10 ft628298123
10 × 12 ft7498118147
12 × 12 ft88118141176
12 × 16 ft118157188235
16 × 16 ft157209251313
20 × 20 ft245326392489
20 × 30 ft367489587734
24 × 24 ft352470564704

The 10 × 10 slab at three thicknesses (10% waste included)

Thickness80 lb bags60 lb bags50 lb bags40 lb bags
4 in628298123
5 in77102123153
6 in92123147184

Every count is the slab's volume plus 10%, divided by the bag's published yield and rounded up. If you are working straight from a volume rather than a slab size, the Concrete Bag Calculator starts from cubic feet or cubic yards instead.

Recommended Slab Thickness by Project

ProjectThicknessNotes
Sidewalk / walkway4 inFoot traffic only; 3,000 PSI mix is fine.
Patio4 inPoured over a compacted gravel base of 2–4 in.
Shed base4 inSize the pad a few inches larger than the shed on each side.
Driveway4–6 in4 in for cars on firm soil; 5–6 in for trucks or soft ground.
Garage floor4–5 in5 in where heavy vehicles or a lift are planned.
RV pad / heavy equipment6 inUse 3,500–4,000 PSI mix and reinforcement.

Thickness is the finished slab only, measured after the base is compacted — the gravel base underneath does not count towards it.

How Far Does Concrete Go? Coverage by Thickness

ThicknessSq ft one cubic yard coversSq ft one 80 lb bag covers
3 in1082.4
4 in811.8
5 in64.81.44
6 in541.2
8 in40.50.9

The shortcut behind the middle column: one cubic yard is 27 cu ft, so divide 324 by the thickness in inches to get the square feet a yard covers at that thickness.

Coverage per bag, by bag size

Thickness40 lb bag50 lb bag60 lb bag80 lb bag
2 in1.8 sq ft2.25 sq ft2.7 sq ft3.6 sq ft
3 in1.2 sq ft1.5 sq ft1.8 sq ft2.4 sq ft
4 in0.9 sq ft1.125 sq ft1.35 sq ft1.8 sq ft
5 in0.72 sq ft0.9 sq ft1.08 sq ft1.44 sq ft
6 in0.6 sq ft0.75 sq ft0.9 sq ft1.2 sq ft

The maths behind every cell: one bag covers its yield divided by the thickness in feet — an 80 lb bag (0.60 cu ft) at 4 inches covers 0.60 ÷ (4 ÷ 12) = 1.8 sq ft. It is the quickest way to sanity-check a small job: a 100 sq ft patio at 4 inches needs 100 ÷ 1.8 = 56 bags of 80 lb mix before waste.

Premix Bag Yields and Bags per Cubic Yard

Bag sizeYield per bagBags per cubic yard
40 lb0.30 cu ft90
50 lb0.375 cu ft72
60 lb0.45 cu ft60
80 lb0.60 cu ft45

Turned around, here is what common ready-mix quantities look like as bags — the comparison to make before deciding which way to buy. The dry-mix weight is the same whichever size you choose (about 3,600 lb per cubic yard), because every standard bag yields the same 0.0075 cu ft per pound of mix:

Cubic yards80 lb bags60 lb bags40 lb bagsDry mix weight
½ yd233045~1,800 lb
1 yd456090~3,600 lb
1½ yd6890135~5,400 lb
2 yd90120180~7,200 lb
3 yd135180270~10,800 lb
4 yd180240360~14,400 lb

Three bag variations sit outside the standard four, and they change the count if they are what your store stocks. 90 lb bags are sold regionally: QUIKRETE rates theirs at 0.675 cu ft per bag and Sakrete at 0.66 cu ft, so a cubic yard takes about 40–41 of them. 50 lb fast-setting mix yields the same 0.375 cu ft as a standard 50 lb bag — the premium buys the 20–40 minute set time, not more concrete. And one genuine exception: Sakrete Maximizer is a high-yield lightweight mix rated at 0.92 cu ft per 80 lb bag — only 30 bags per cubic yard — so if the bag says Maximizer, divide your cubic feet by 0.92, not 0.60. (Yields as published by the manufacturers; the 90 lb and Maximizer figures are collected on CalculatingConcrete's concrete bag calculator page, checked November 2026.)

Common Concrete Estimating Mistakes

  1. Ordering the exact calculated figure. The maths assumes a perfectly level base and forms that do not bow. Real ground is neither — order the figure with 5–10% waste, rounded up to the next quarter yard, or the truck leaves with the last corner unfilled.
  2. Measuring outside the forms. Measure inside the form boards. The outside dimension adds the width of the lumber all the way round and overstates the slab — on a small pad, by a noticeable percentage.
  3. Counting the gravel base as slab thickness. A 4-inch slab on a 4-inch base is a 4-inch slab. The base is not concrete, does not go in this calculator, and ordering 8 inches of concrete for it doubles the bill.
  4. Rounding bags down. 55.6 bags is 56 bags — part-bags do not exist at the store, and the last bag is the one that finishes the corner you are standing in.
  5. Adding water on site to raise the slump. Extra water makes the mix easier to place and permanently weaker — roughly a gallon per yard buys about an inch of slump and can cost a few hundred PSI of strength. If the mix is too stiff, tell the driver; plasticiser is the fix, not the hose.

The Constants Behind the Numbers

Every figure this calculator produces rests on a handful of published constants, so you can check them rather than trust them. Density: normal-weight concrete weighs about 150 lb per cubic foot (the figure used across NRMCA guidance — see NRMCA CIP 31, Ordering Ready-Mixed Concrete), so a cubic yard weighs about 4,050 lb — just over 2 tons. Bag yields: the 0.60 cu ft (80 lb), 0.45 cu ft (60 lb) and 0.30 cu ft (40 lb) yields are the manufacturers' published figures, printed on the bag — the QUIKRETE 1101 concrete mix data sheet (PDF) is the reference this site uses. Both source documents were checked in November 2026. Volume: 1 cubic yard = 27 cubic feet, exactly. If a bag in your hand prints a different yield, divide your cubic feet by that number instead — the method does not change.

Bags vs Ready-Mix: Where the Crossover Falls

The maths of bags is seductive — no delivery fee, no clock — until you price the labour. Mixing and placing by hand, one person with a rented drum mixer sustains roughly a quarter to half a cubic yard in a long day; the 10 × 10 slab above (1.23 yards, 56 bags, 4,480 lb of dry mix) is a full weekend for one person and a hard day for two. Ready-mix flips the problem: the concrete arrives all at once and the clock runs — about 90 minutes of working time — but a small order carries a short-load fee, commonly charged under 3–4 yards, which can add the price of another yard to a 1.5-yard order. The practical crossover for most homeowners: under about half a yard, buy bags; over about a yard, order the truck; in between, price both — the calculator's cost fields exist for exactly that comparison. Our guide to bags of concrete in a cubic yard has the full per-yard bag table.

What a Yard of Concrete Weighs — and Why the Truck Matters

At roughly 4,050 lb per cubic yard, concrete is the heaviest thing most home projects handle. A standard mixer truck carries 8–10 yards — 16 to 20 tons of concrete alone, on top of the truck — which is why suppliers ask about access, why trucks stay off fresh driveways and soft ground, and why the chute only reaches about 10–12 feet from where the truck can stand. If your slab is further from the street than the chute reaches, budget for wheelbarrow runs (a cubic yard is roughly 25–30 loaded wheelbarrow trips) or a concrete pump, and tell the supplier when you order — not when the truck is idling outside.

Ordering Ready-Mix: The Checklist

  1. Quantity: your calculated yards plus 5–10% waste, rounded to the supplier's step (usually a quarter yard). Confirm whether the short-load fee applies.
  2. Strength: 3,000 PSI for walkways and patios, 3,500–4,000 PSI for driveways and garage floors.
  3. Air entrainment if the slab will see freeze-thaw cycles outdoors.
  4. Slump: a 4–5 inch slump is the workable standard for slabs; do not let anyone add water on site to make it easier — extra water weakens the finished concrete.
  5. Timing: forms finished, base compacted and dampened, tools and at least one helper ready before the truck's arrival window; know where the truck will wash out.
  6. Access: measure the route — gate width, overhead lines, soft ground — and say so when ordering if a pump or wheelbarrows will be needed.

Tips for an Accurate Estimate

Frequently Asked Questions

How many bags of concrete do I need for a 10x10 slab?

A 10 ft by 10 ft slab at the standard 4-inch thickness is 33.33 cubic feet of concrete. That works out to 56 bags of 80 lb premix (0.6 cu ft each) or 75 bags of 60 lb premix (0.45 cu ft each). At 6 inches thick it jumps to 84 bags of 80 lb mix. Because of the sheer weight and mixing time, most people order this as ready-mix: 1.23 cubic yards, rounded up to 1.5 with a waste allowance.

How do I calculate cubic yards of concrete?

Multiply length by width by thickness, all in feet (divide inches by 12), to get cubic feet, then divide by 27. For example, a 12 ft by 12 ft slab 4 inches thick is 12 × 12 × 0.333 = 48 cubic feet, and 48 ÷ 27 = 1.78 cubic yards. Add 5–10% for waste before ordering.

How thick should a concrete slab be?

Four inches is the standard for patios, walkways, shed bases and most residential floors. Driveways and garage floors that carry cars are usually 4–5 inches, and 6 inches is used where trucks or heavy equipment will park. Thickness is measured after the base is compacted, and a gravel base of 2–4 inches under the slab is normal practice — the base does not count as slab thickness.

Is it cheaper to buy bags or ready-mix concrete?

For very small jobs — a few post holes, a small repair, under about a quarter of a cubic yard — bags win because there is no delivery fee. Ready-mix becomes cheaper per cubic foot as the volume grows, but most suppliers charge a short-load fee for orders under 3–4 yards, and the truck gives you a limited working window. Between roughly a quarter yard and 3 yards, compare the bag price (including a mixer rental) against the ready-mix price plus fees for your area.

How much does a cubic yard of concrete cover?

One cubic yard is 27 cubic feet, so coverage depends on thickness: at 4 inches thick a yard covers 81 square feet, at 6 inches it covers 54 square feet, and at 3 inches it covers 108 square feet. A quick check: divide 27 by the thickness in feet to get the square feet one yard covers.

How many 80 lb bags do I need for a 4x4 slab?

A 4 ft by 4 ft slab at 4 inches thick is 5.33 cubic feet, so 5.33 ÷ 0.6 = 9 bags of 80 lb mix (12 bags of 60 lb). Small slabs like this are exactly where bags beat a ready-mix truck — no delivery or short-load fee.

What PSI concrete should I order for a driveway?

3,500–4,000 PSI is the common residential driveway range; 3,000 PSI is fine for walkways and patios. In freeze-thaw climates, also ask for air-entrained mix — the tiny air bubbles give freezing water room to expand and are the difference between a driveway that lasts and one that scales. Tell the supplier the use and they will confirm the mix.

How long do I have to place ready-mix concrete?

Plan on about 90 minutes from when the truck is batched to finish discharge — the standard window in ASTM C94 — and less on a hot day. Have forms, base, tools and help ready before the truck arrives; concrete does not wait. If the pour will run long, tell the supplier when ordering so they can space trucks or adjust the mix.

Sources and Method

The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.