How Much Concrete Do I Need for a Sidewalk?
A sidewalk is a long, thin slab, so the concrete is the easy part — the joints are what keep it from cracking. The chart below gives yards, bags and joint counts for the walks people actually pour.
Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.
The short answer: length × width × thickness, then add 10%
A sidewalk is a rectangular slab, so the volume is cubic yards = length (ft) × width (ft) × thickness (in) ÷ 324 — the same formula the Concrete Calculator uses. Add the standard 10% waste allowance for an uneven sub-base and spillage, then round the order up to the next quarter yard, because ready-mix is sold in quarter-yard steps. For bags, divide the with-waste cubic feet by 0.60 — the yield of an 80 lb bag — and round up. Our guide to how much concrete you need covers the same formula for slabs in general; this guide is about the walk itself — its width, its thickness, and its joints.
Width and thickness
Width: a residential walk is usually 3–4 ft wide — 3 ft for a path to a side door or through a garden, 4 ft for the main walk from the street or driveway to the front door, wide enough for two people to pass. A public sidewalk is 4–5 ft wide, and many towns set a minimum width, so check the local code before forming up a walk along the street. Thickness: 4 inches is the standard for a walk — the same as a patio slab — and it is what the chart below assumes. Where the walk crosses a driveway, pour that section 6 inches thick, because it has to carry vehicles, not just feet. Under the slab, put 4 inches of compacted gravel base (our guide to how thick gravel should be covers the base depths) — a walk poured straight onto soft soil settles and cracks, whatever the concrete quantity says.
Concrete for common sidewalk sizes
The table is for a 4-inch-thick walk with the 10% waste allowance included. The "order" column rounds up to the next quarter yard, and the bag column counts 80 lb bags from the with-waste volume. A walk that turns a corner is two rectangles: measure each run separately and add them, counting the corner once — the worked L-shaped example below shows how.
| Sidewalk size | Net cubic yards | Order (with 10% waste) | 80 lb bags |
|---|---|---|---|
| 20 ft × 3 ft | 0.74 | 1.00 yd³ | 37 |
| 20 ft × 4 ft | 0.99 | 1.25 yd³ | 49 |
| 20 ft × 5 ft | 1.23 | 1.50 yd³ | 62 |
| 30 ft × 3 ft | 1.11 | 1.25 yd³ | 55 |
| 30 ft × 4 ft | 1.48 | 1.75 yd³ | 74 |
| 30 ft × 5 ft | 1.85 | 2.25 yd³ | 92 |
| 40 ft × 3 ft | 1.48 | 1.75 yd³ | 74 |
| 40 ft × 4 ft | 1.98 | 2.25 yd³ | 98 |
| 40 ft × 5 ft | 2.47 | 2.75 yd³ | 123 |
| 50 ft × 3 ft | 1.85 | 2.25 yd³ | 92 |
| 50 ft × 4 ft | 2.47 | 2.75 yd³ | 123 |
| 50 ft × 5 ft | 3.09 | 3.50 yd³ | 153 |
Two things the table makes plain. First, a sidewalk is a small pour by truck standards: even a 50 ft walk at 5 ft wide is only 3.5 yards, and most walks are under 2 — which is why the short-load fee matters (see below). Second, the bag counts climb fast: 74 bags for an ordinary front walk is a full day of mixing by hand, and 153 bags is not a plan at all.
Worked examples
A front walk, 30 ft long × 4 ft wide at 4 inches. The volume is 30 × 4 × 4 ÷ 324 = 1.48 cubic yards. With 10% waste that is 1.63 yards, so order 1.75 cubic yards. In bags that is 1.63 × 27 = 44.0 cu ft, and 44.0 ÷ 0.60 = 73.33, so 74 bags of 80 lb mix. At the site's rough ready-mix range of $125–$180 per cubic yard, the truck costs 1.75 × $125–$180 = $219–$315, against 74 × $7 = $518 in bags — the truck wins even before the labour is counted.
A garden path, 25 ft long × 3 ft wide at 4 inches. The volume is 25 × 3 × 4 ÷ 324 = 0.93 cubic yards. With 10% waste that is 1.02 yards, so order 1.25 cubic yards, or 46 bags (27.5 cu ft ÷ 0.60 = 45.83, rounded up). A path this size is the one case where bags are a genuine option: 46 bags is a long afternoon, but it is doable, and it avoids a short-load fee on a 1.25-yard delivery.
A long sidewalk, 50 ft long × 5 ft wide at 4 inches. The volume is 50 × 5 × 4 ÷ 324 = 3.09 cubic yards. With 10% waste that is 3.40 yards, so order 3.50 cubic yards — or 153 bags (91.7 cu ft ÷ 0.60 = 152.83, rounded up). At this size the truck is the only sensible buy: 153 bags is over 12,000 lb of dry mix to carry, open and mix by hand.
A driveway crossing, 12 ft long × 4 ft wide at 6 inches. The crossing is thicker, so the volume is 12 × 4 × 6 ÷ 324 = 0.89 cubic yards. With 10% waste that is 0.98 yards, so order 1.00 cubic yard, or 45 bags (26.4 cu ft ÷ 0.60 = 44.1, rounded up). Pour the crossing as its own section with the extra thickness — thickening the whole walk to 6 inches to cover one crossing wastes concrete on every foot that only ever sees feet.
An L-shaped walk: 20 ft × 4 ft plus 15 ft × 3 ft, both at 4 inches. Split it into two rectangles and count the corner once. Run one: 20 × 4 × 4 ÷ 324 = 0.99 yards. Run two: 15 × 3 × 4 ÷ 324 = 0.56 yards. Net total 1.54 yards; with 10% waste 1.70 yards, so order 1.75 cubic yards. The joints run down each leg: the two legs together are 35 ft, and at a 4 ft spacing that is 8 interior joints (see below). Our guide to measuring an L-shaped room uses the same split-into-rectangles method, and it works for a walk for the same reason — the corner belongs to one leg or the other, never both.
Control joints — the part that stops the cracking
Concrete shrinks as it cures, and a sidewalk without joints cracks wherever it pleases. Control joints give it a planned place to crack: a groove cut or tooled across the walk at regular intervals, about a quarter of the slab's depth (1 inch deep on a 4-inch walk). Space them about the width of the walk apart — every 4 ft on a 4 ft walk, every 5 ft on a 5 ft walk — which also fits the general rule from our driveway guide: joint spacing in feet no more than 2–3 times the thickness in inches, so 8–12 ft at most for a 4-inch slab. A 4 ft spacing is well inside that limit, and it looks right: a walk divided into squares reads as intentional, while a 12 ft run of unjointed walk reads as a crack waiting to happen. For the 30 ft front walk above, joints every 4 ft mean 7 interior joints (8 sections); for the 35 ft L-shaped walk, 8 interior joints. Tool the joints while the concrete is still workable, or saw-cut them the same day — a joint cut a week later is a decoration, not a control joint.
Bags or a truck?
The crossover is about 1 cubic yard — 45 bags of 80 lb mix, roughly $315 in bags against $125–$180 a yard from a truck — the same crossover our guide to bagged concrete vs ready-mix works out in detail. Below a yard, bags can be cheaper once delivery is counted; above it, the truck wins on price and overwhelmingly on labour. The catch for sidewalks is the short-load fee: most suppliers charge extra for orders under about 3 cubic yards, because the truck still has to come out. A 1.75-yard walk might carry a $50–$150 short-load fee on top of the per-yard price — ask the supplier before ordering, and if two neighbours need walks, order together and split the load. Even with the fee, the 30 ft front walk above costs $219–$315 plus the fee against $518 in bags, and the concrete arrives mixed, in one pour, instead of 74 bags into a wheelbarrow.
Common mistakes
- Ordering the net volume. The 1.48-yard walk needs 1.63 yards with waste, and the truck is ordered at 1.75. Ordering exactly 1.48 runs out a few feet from the end.
- Spacing the joints too far apart. Joints belong about a walk-width apart. A 30 ft walk with two joints will crack between them — the joints are the cheapest insurance on the job.
- Pouring the crossing at 4 inches. The driveway crossing carries vehicles. Pour it at 6 inches, as its own thicker section.
- Measuring the outside of the forms. Measure the inside of the forms — the concrete goes inside them. An inch of formwork on each side overstates a 4 ft walk by over 4%.
- Skipping the gravel base. Four inches of compacted gravel under the slab stops the walk settling and cracking. Concrete on soft soil is a temporary walk.
- Bagging a truck-sized walk. Above about a cubic yard, 45+ bags is a punishment, not a saving. The truck is cheaper per yard and incomparably less work.
Frequently Asked Questions
How much concrete do I need for a 30 ft sidewalk?
A 30 ft long, 4 ft wide sidewalk at 4 inches thick takes 1.48 cubic yards net — order 1.75 cubic yards with the 10% waste allowance, or 74 bags of 80 lb mix. At 3 ft wide the same length takes 1.11 yards net, so order 1.25 yards or 55 bags.
How thick should a concrete sidewalk be?
4 inches for a walk that only carries foot traffic, on a 4-inch compacted gravel base. Pour the section where the walk crosses a driveway at 6 inches thick, because that part carries vehicles.
How far apart should control joints be on a sidewalk?
About the width of the walk apart — every 4 ft on a 4 ft walk, every 5 ft on a 5 ft walk. The outer limit is the general rule of 2–3 times the thickness in inches, so 8–12 ft at most for a 4-inch slab, but a walk-width spacing looks better and controls cracking better.
How many bags of concrete for a sidewalk?
Divide the with-waste cubic feet by 0.60 (the yield of an 80 lb bag). A 30 ft × 4 ft walk at 4 inches takes 74 bags; a 25 ft × 3 ft path takes 46 bags; a 50 ft × 5 ft sidewalk takes 153 bags — at that size, order ready-mix instead.
Is it cheaper to use bags or ready-mix for a sidewalk?
Ready-mix is cheaper above about 1 cubic yard: a 30 ft × 4 ft walk costs roughly $219–$315 from a truck (1.75 yards at $125–$180 per yard) against $518 in bags — plus a possible short-load fee under about 3 yards, so ask the supplier. Below a yard, bags can win once delivery is counted.
Sources and Method
The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.
- NRMCA CIP 31 — Ordering Ready-Mixed Concrete (ready-mix ordering and waste guidance).
- QUIKRETE Concrete Mix No. 1101 data sheet — published yield per bag (0.30 / 0.45 / 0.60 cu ft for 40 / 60 / 80 lb bags).
- Standard concrete density of about 150 lb per cubic foot.
- QUIKRETE Concrete Mix No. 1101 data sheet (PDF) — yield per bag: 0.30 cu ft (40 lb), 0.375 cu ft (50 lb), 0.45 cu ft (60 lb), 0.60 cu ft (80 lb); mixing water about 6 pt per 80 lb bag. Checked November 2026.