How Many Yards of Concrete Do I Need?

Concrete is ordered by the cubic yard. A 12×12 patio at 4 inches is 1.78 yards — order 2 — and a 24×24 slab at 6 inches is 10.67 yards, more than one truckload.

Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.

The short answer: figure the yards, add 10%, round up

Concrete is sold by the cubic yard — one cubic yard is 27 cubic feet, a cube 3 ft on every side. A 12 × 12 ft patio poured 4 inches thick takes 1.78 cubic yards, so you order 2 yards. A 20 × 20 ft garage slab at 4 inches takes 4.94 yards — order 5.5. And a 24 × 24 ft slab at 6 inches takes 10.67 yards, which is more than a standard mixer truck carries, so it arrives in two loads.

The three steps are the same for every job: work out the exact volume, add about 10% for waste and uneven ground, then round up to the nearest quarter yard — the amount a supplier can actually load. Use the Concrete Calculator for the exact figure on your job — every number on this page matches it.

The formula

For a slab, multiply length by width by thickness, with the thickness in inches:

Cubic yards = length (ft) × width (ft) × thickness (in) ÷ 324

The 324 comes from the unit conversion: 27 cubic feet in a yard times 12 inches in a foot. A 12 × 12 ft patio at 4 inches is 12 × 12 × 4 ÷ 324 = 576 ÷ 324 = 1.78 cubic yards. The same job in cubic feet is 12 × 12 × (4 ÷ 12) = 48 cubic feet, and 48 ÷ 27 = 1.78 yards — the two routes agree, which is a good check on your arithmetic. For the full derivation and other materials, see our guide to calculating cubic yards.

Common slabs: yards to order

The table below gives the exact volume, the order with a 10% waste allowance, and the bag count if you were mixing it yourself. The order column is rounded up to the nearest quarter yard — that is how ready-mix is sold:

SlabExact volumeOrder (with 10% waste)80-lb bags
10 × 10 ft patio, 4 in1.23 yd³1.5 yd³56 bags
12 × 12 ft patio, 4 in1.78 yd³2 yd³80 bags
12 × 12 ft patio, 6 in2.67 yd³3 yd³120 bags
12 × 20 ft driveway, 4 in2.96 yd³3.5 yd³134 bags
20 × 20 ft garage, 4 in4.94 yd³5.5 yd³223 bags
24 × 24 ft slab, 6 in10.67 yd³11.75 yd³480 bags

The bag counts come from the yield of an 80-lb bag — 0.6 cubic feet, so 45 bags make one cubic yard. A 60-lb bag yields 0.45 cubic feet, so it takes 60 of them per yard; the 12 × 20 ft driveway above would need 178 sixty-pound bags. For the full bag table, see our guide to bags of concrete per cubic yard.

Every common size at 4 inches: the shared table

For sizes the chart above does not cover, this is the same slab-size table the concrete calculator page uses — same rows, same numbers, all at 4 inches thick:

Slab sizeAreaCubic feetCubic yardsCu yd with 10% waste80 lb bags60 lb bags
4 × 4 ft16 sq ft5.330.200.22912
6 × 6 ft36 sq ft12.000.440.492027
8 × 8 ft64 sq ft21.330.790.873648
8 × 10 ft80 sq ft26.670.991.094560
10 × 10 ft100 sq ft33.331.231.365675
10 × 12 ft120 sq ft40.001.481.636789
12 × 12 ft144 sq ft48.001.781.9680107
12 × 16 ft192 sq ft64.002.372.61107143
16 × 16 ft256 sq ft85.333.163.48143190
20 × 20 ft400 sq ft133.334.945.43223297
20 × 30 ft600 sq ft200.007.418.15334445
24 × 24 ft576 sq ft192.007.117.82320427

And the coverage table — how far a yard goes is set by the thickness:

ThicknessSq ft one cubic yard coversSq ft one 80 lb bag covers
3 in1082.4
4 in811.8
5 in64.81.44
6 in541.2
8 in40.50.9

Step 2: add the waste allowance

Never order the exact volume. The ground under a slab is never perfectly level, forms flex, and a little concrete always stays in the wheelbarrow and the chute. Add 10% to the exact volume — 5% if the subgrade is well compacted and level, 10% as the safe default. The 12 × 12 ft patio is 1.78 × 1.10 = 1.96 yards, which rounds up to 2. The 20 × 20 ft garage is 4.94 × 1.10 = 5.43 yards, which rounds up to 5.5. Ordering a quarter yard short and running out mid-pour is far worse than having a quarter yard left over — a cold joint in the middle of a slab is a permanent weak line. For the waste allowance on every material, see our guide to material waste factors.

Step 3: round up to what a truck can carry

Ready-mix suppliers sell by the yard and usually let you round to the nearest quarter yard. Always round up — a 1.96-yard job becomes 2 yards, not 1.75. The extra quarter yard costs roughly $30–$45 at typical ready-mix prices and buys insurance against a short load; a second truck for a quarter yard costs far more.

How much fits in one truck?

A standard mixer truck carries about 10 cubic yards at a full load, though local weight limits sometimes cap it lower. That decides how your order arrives:

Order sizeHow it arrives
Under 1 yd³Usually bagged concrete instead — a truckload is rarely worth it (see below)
1–3 yd³One small load; many suppliers add a short-load fee under about 3 yd³
3–10 yd³One standard mixer truck
10–20 yd³Two trucks — schedule the second to arrive as the first finishes
Over 20 yd³Multiple trucks, or a pump truck for large slabs

On a two-truck job, time the second truck to arrive just as the first is finishing — concrete that waits in the drum too long starts to set, and concrete that arrives before the crew is ready has the same problem. The 24 × 24 ft slab at 6 inches in the table above is 10.67 yards: one full 10-yard truck plus a 1.75-yard second load, or two roughly equal loads of about 6 yards each.

Small loads: the short-load fee

Many suppliers charge a short-load fee for orders under about 3 cubic yards, because the truck, driver and batching cost the same whether it carries 1 yard or 10. The fee varies by supplier, so ask before ordering — on a 1-yard job it can add as much as the concrete itself. That is why the crossover with bagged concrete matters: under roughly half a cubic yard, bags are usually cheaper, and up to about 1–1.5 yards the two are close once the fee is counted. One cubic yard as bags is 45 eighty-pound bags; at roughly $7 a bag that is about $315, against $125–$180 a yard for ready-mix before any fee. Our guide to bagged concrete vs ready-mix works the crossover out job by job.

Footings and walls are not slabs

Not every concrete job is a flat slab. A strip footing is a long rectangular trench, and a foundation wall is a tall thin rectangle — the same length × width × thickness formula applies, with the units kept straight:

Strip footing. A footing 30 ft long, 12 inches wide and 12 inches deep is 30 × 1 × 1 = 30 cubic feet, which is 30 ÷ 27 = 1.11 cubic yards — order 1.25 with the waste allowance. In bags that is 50 eighty-pound bags, which is why footings under about a yard are often mixed by hand.

Foundation wall. A wall 20 ft long, 8 inches thick and 8 ft high is 20 × (8 ÷ 12) × 8 = 106.67 cubic feet, which is 106.67 ÷ 27 = 3.95 cubic yards — order 4.5. The thickness goes in as feet here (8 inches = 0.67 ft), which is the step people get wrong: using 8 instead of 0.67 would give a figure twelve times too big. For post holes and pier footings, which are cylinders rather than boxes, see our guide to concrete for post holes and footings.

Rough cost

Ready-mix concrete typically runs roughly $125–$180 per cubic yard, before delivery and any short-load fee — treat that as a rough range only, because prices vary by region and by mix. On that basis the 12 × 12 ft patio at 2 yards costs roughly $250–$360, the 20 × 20 ft garage at 5.5 yards roughly $690–$990, and the 24 × 24 ft slab at 11.75 yards roughly $1,470–$2,115. Stronger mixes, fibre reinforcement and weekend delivery all add to the price, so get a quote with the exact yardage in hand rather than a round number.

Common mistakes

  1. Ordering the exact volume. A slab poured to the exact figure runs short — the ground is never perfectly level. Add 10% and round up.
  2. Mixing up inches and feet in the thickness. A 4-inch slab is 4 ÷ 12 = 0.33 ft thick, not 4 ft. The ÷ 324 formula keeps the thickness in inches, which is why it is the safer one to use.
  3. Forgetting the footing under the slab edge. A thickened edge or a perimeter footing adds volume the slab formula does not count — work it out separately and add it in.
  4. Ordering bags by the yardage. A cubic yard is 45 eighty-pound bags, not 27 and not 40. At 480 bags, the 24 × 24 ft slab above is a truck job, not a weekend of mixing.
  5. One truck for more than 10 yards. A standard mixer holds about 10 yards. Ordering 11.75 yards as one load means the last 1.75 yards never arrives.

Quick answers for other slab sizes

How many yards of concrete for a 14×20 slab?

At 4 inches thick: 93.33 cu ft = 3.46 cubic yards — order 4 yards with waste and rounding — or 156 bags of 80-lb mix.

How many yards for a 16×20 slab?

At 4 inches thick: 106.67 cu ft = 3.95 cubic yards — order 4.5 yards — or 178 bags.

How many yards for a 10×30 slab?

At 4 inches thick: 100 cu ft = 3.70 cubic yards — order 4.25 yards — or 167 bags.

How many yards for an 18×24 slab?

At 4 inches thick: 144 cu ft = 5.33 cubic yards — order 6 yards — or 240 bags.

Frequently Asked Questions

How many yards of concrete do I need for a 12x12 patio?

1.78 cubic yards at 4 inches thick — order 2 yards with the 10% waste allowance. At 6 inches it is 2.67 yards, so order 3. In bags, the 4-inch patio is 80 eighty-pound bags.

How many cubic yards are in a truckload of concrete?

A standard mixer truck carries about 10 cubic yards at a full load, though local weight limits sometimes cap it lower. Jobs over 10 yards arrive in two or more loads.

What is the minimum amount of concrete you can order?

Most suppliers will deliver as little as 1 cubic yard, but many add a short-load fee for orders under about 3 yards. Under roughly half a yard, bagged concrete is usually cheaper than a truck.

How do I convert cubic feet to cubic yards of concrete?

Divide by 27 — one cubic yard is 27 cubic feet. A 48 cubic foot patio is 48 ÷ 27 = 1.78 yards. For a slab, length × width × thickness in inches ÷ 324 gives yards directly.

How many 80 lb bags of concrete are in a yard?

45 bags. An 80-lb bag yields 0.6 cubic feet, and 27 ÷ 0.6 = 45. A 60-lb bag yields 0.45 cubic feet, so it takes 60 of those per yard.

Related Calculators