How to Calculate Cubic Yards

Cubic yards = (length × width × depth in feet) ÷ 27. If you already know the area in square feet and the depth in inches, just multiply them and divide by 324. A 10×10 ft slab at 4 inches thick is 1.23 cubic yards — order 1.5.

Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.

The formula

A cubic yard is a cube 3 feet long, 3 feet wide and 3 feet deep — 3 × 3 × 3 = 27 cubic feet. So to calculate cubic yards, work out the volume in cubic feet first, then divide by 27. That one number is the whole trick, and it works for concrete, mulch, gravel, topsoil and sand alike — the material changes what you order, not the maths.

  1. Measure length, width and depth in feet. Depth in inches ÷ 12 = depth in feet (4 inches = 0.33 ft, 6 inches = 0.5 ft, 12 inches = 1 ft).
  2. Multiply them: length × width × depth = volume in cubic feet.
  3. Divide by 27 to get cubic yards — and round up. Running short mid-job is far worse than having a little extra.
Cubic yards = (length in ft × width in ft × depth in ft) ÷ 27

Use the Cubic Yards Calculator for exact numbers on any size — the examples below cover the common jobs.

The ÷324 shortcut

Most people already know their area in square feet and the depth in inches — a 200 sq ft bed at 3 inches of mulch, say. Converting inches to feet first is an extra step you can skip: since 27 × 12 = 324, multiply square feet by inches and divide by 324.

Cubic yards = (area in sq ft × depth in inches) ÷ 324

A 200 sq ft bed at 3 inches: 200 × 3 ÷ 324 = 1.85 cubic yards. Same answer as the long way (200 × 0.25 ft = 50 cu ft ÷ 27 = 1.85) — just faster. Keep this one in your pocket; it is the formula suppliers and landscapers actually use on site.

Cubic feet to cubic yards (and back)

If a supplier or a bag label gives you cubic feet, divide by 27: 54 cu ft is exactly 2 cubic yards, 100 cu ft is 3.70 yards. Going the other way, multiply yards by 27: 2 cubic yards is 54 cu ft, 3.5 yards is 94.5 cu ft. Bagged material is usually sold by the cubic foot — one cubic yard takes 13.5 bags of 2 cu ft, or 9 bags of 3 cu ft — so this conversion is how you compare a bag price with a bulk price.

Worked examples — one per material

Five jobs, same formula. The “order” column adds 10% for waste, then rounds up to the next quarter yard — that is the amount to actually buy.

JobSizeCalculationCubic yardsOrder (with 10% waste)
Concrete slab10×10 ft, 4 in thick33.3 cu ft ÷ 271.231.5 yd³
Mulch bed20×10 ft, 3 in deep200 × 3 ÷ 3241.852.25 yd³
Gravel driveway24×12 ft, 4 in deep288 × 4 ÷ 3243.564 yd³
Topsoil garden bed12×8 ft, 6 in deep96 × 6 ÷ 3241.782 yd³
Sandbox8×8 ft, 12 in deep64 × 12 ÷ 3242.372.75 yd³

Three of those numbers are worth translating into what you actually lift or pay for: the mulch bed needs 25 × 2-cu-ft bags (1.85 × 13.5); the gravel driveway weighs about 5 tons (3.56 yd³ × ~1.4 tons per yard); the topsoil bed about 2 tons (1.78 × ~1.1). For the concrete slab, see How Much Concrete Do I Need? — 1.23 yards is 56 × 80-lb bags, which is why most people order a ready-mix truck instead.

How far does one cubic yard go?

Flip the question around: one cubic yard spread at a given depth covers a fixed area. This table is the quickest check when you are standing in the yard with a tape measure.

DepthArea one cubic yard covers
1 inch324 sq ft
2 inches162 sq ft
3 inches108 sq ft
4 inches81 sq ft
6 inches54 sq ft
12 inches27 sq ft

Read it backwards to sanity-check any order: a 3-inch mulch bed over 200 sq ft needs about 2 yards (200 ÷ 108 = 1.85 — matches the worked example). A 4-inch gravel driveway 24 × 12 ft is 288 sq ft ÷ 81 = 3.56 yards — again, the same number.

Irregular shapes

Most real jobs are not perfect rectangles. Split the shape into rectangles, work out each part, and add them up. An L-shaped mulch bed of 12 × 10 ft plus 6 × 4 ft is 120 + 24 = 144 sq ft; at 3 inches deep that is 144 × 3 ÷ 324 = 1.33 cubic yards. For a circle — a tree ring, a round patio base — area is π × radius²: a 10-ft-wide circle is 3.14 × 5² = 78.5 sq ft, and at 3 inches deep that is 78.5 × 3 ÷ 324 = 0.73 cubic yards. The Cubic Yards Calculator handles rectangles and circles for you, including the waste allowance.

What does it cost? (2026, US, rough ranges)

Prices vary a lot by region and by supplier — treat these as planning numbers and get a local quote before ordering:

Common mistakes

  1. Forgetting to convert inches to feet. Depth in inches must be divided by 12 (or use the ÷324 shortcut). Skip that step and the answer comes out 12× too big.
  2. Dividing by 9 instead of 27. A square yard is 9 sq ft, but a cubic yard is 27 cu ft — the two get mixed up constantly. Volume always divides by 27.
  3. Ordering exactly the calculated amount. Uneven ground, spillage and settling eat 5–10%. Add the waste allowance first, then round up — leftover mulch can top up a bed, a short pour cannot be topped up cleanly.
  4. Measuring the depth after the material settles. Loose mulch and gravel compact by roughly 10–20% once spread and watered or driven on. Measure the finished depth you want, not the loose pile, and order for that.

What does a cubic yard weigh? Material weights and truck loads

Volume tells you what to order; weight tells you whether you can move it. A cubic yard is the same 27 cubic feet for every material, but the scale reading swings from 600 lb to over 4,000 lb depending on what fills it. These are the same typical loose densities the Cubic Yards Calculator uses when you pick a material — moisture moves all of them, and wet sand or soil can run about 20% heavier than the figures here.

Materiallb per cubic yardTons per yardPickup loads per yard*
Mulch6000.300.4
Compost1,2000.600.8
Topsoil, screened2,0251.011.4
Fill dirt2,1501.071.4
Asphalt millings2,5001.251.7
Crushed concrete2,6001.301.7
Gravel / crushed stone2,7001.351.8
Sand, dry2,7001.351.8
River rock2,8001.401.9
Sand, wet3,2001.602.1
Concrete (mixed)4,0502.022.7

*Pickup loads assume a typical half-ton payload of about 1,500 lb. Check your own truck's payload sticker — it is printed on the driver's door jamb, and it is lower than most owners expect.

Read the loads column as a planning rule: anything much past two yards of a stone or soil material is a delivery, not a Saturday of trips. A supplier's dump truck typically carries 10–14 cubic yards of a light material like mulch, but far less of a heavy one — weight limits, not the size of the bed, cap a load of gravel or concrete at roughly 5–7 yards. That is also why suppliers quote heavy materials by the ton: the truck is weighed, not measured. If you are collecting yourself, weigh the payload against the table before the loader drops the first bucket — one yard of wet sand at 3,200 lb is already double a half-ton truck's rating.

Frequently Asked Questions

How do I calculate cubic yards from square feet?

Multiply the area in square feet by the depth in inches, then divide by 324. Example: 200 sq ft at 3 inches = 200 × 3 ÷ 324 = 1.85 cubic yards.

How many cubic feet are in a cubic yard?

27. A cubic yard is 3 ft × 3 ft × 3 ft. Divide cubic feet by 27 to get cubic yards, or multiply cubic yards by 27 to get cubic feet.

How many cubic yards do I need for a 10×10 slab?

At 4 inches thick: 1.23 cubic yards — order 1.5 with waste. At 6 inches thick: 1.85 yards — order 2.25. See How Much Concrete Do I Need? for the full table.

How many bags of mulch are in a cubic yard?

13.5 bags of 2 cu ft, or 9 bags of 3 cu ft. A 1.85-yard mulch bed takes 25 × 2-cu-ft bags.

How many tons is a cubic yard of gravel?

About 1.4 tons — so a 3.56-yard driveway is roughly 5 tons. Densities vary by stone type (roughly 1.25–1.55 tons per yard), so confirm with your supplier before ordering by weight.

Sources and Method

The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.

Related Calculators