How Many Bags of Concrete Are in a Cubic Yard?
One cubic yard takes 45 bags of 80-lb premix, 60 bags of 60-lb, 72 bags of 50-lb, or 90 bags of 40-lb. Smaller bags just mean more bags — the total concrete (27 cubic feet) and the total weight (about 3,600 lb) are the same either way.
Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.
Bags per cubic yard — the table
| Bag size | Yield per bag | Bags per cubic yard | Weight per yard |
|---|---|---|---|
| 80-lb | 0.60 cu ft | 45 | 3,600 lb (1.8 tons) |
| 60-lb | 0.45 cu ft | 60 | 3,600 lb (1.8 tons) |
| 50-lb | 0.375 cu ft | 72 | 3,600 lb (1.8 tons) |
| 40-lb | 0.30 cu ft | 90 | 3,600 lb (1.8 tons) |
The maths: 27 cu ft ÷ yield per bag. So 27 ÷ 0.6 = 45, 27 ÷ 0.45 = 60, 27 ÷ 0.375 = 72, 27 ÷ 0.30 = 90. Yields are the standard premix figures and match the site's own calculators; a specific brand's bag can differ slightly, so check the yield printed on the bag and use the Concrete Bag Calculator for the exact count.
Bags for common jobs
| Job | Volume | 80-lb bags | 60-lb bags | 40-lb bags |
|---|---|---|---|---|
| 10×10 ft slab, 4 in thick | 33.3 cu ft (1.23 yd³) | 56 | 75 | 112 |
| 10×10 ft slab, 4 in, +10% waste | 36.7 cu ft | 62 | 82 | 123 |
| 12×12 ft slab, 4 in thick | 48 cu ft (1.78 yd³) | 80 | 107 | 160 |
| 10×10 ft slab, 6 in thick | 50 cu ft (1.85 yd³) | 84 | 112 | 167 |
| Half a cubic yard | 13.5 cu ft | 23 | 30 | 45 |
| 2 cubic yards | 54 cu ft | 90 | 120 | 180 |
| Post hole, 12 in wide × 3 ft deep | 2.36 cu ft | 4 | 6 | 8 |
Bag counts are exact division rounded up (e.g. 33.3 ÷ 0.6 = 55.6 → 56 bags). Always add 10% for waste and spillage — the second row shows what that does to a 10×10 slab.
Slab sizes: yards and bags side by side
Bag counts only make sense next to the yardage they replace. This is the same slab-size table the concrete calculator page uses — same rows, same numbers:
| Slab size | Area | Cubic feet | Cubic yards | Cu yd with 10% waste | 80 lb bags | 60 lb bags |
|---|---|---|---|---|---|---|
| 4 × 4 ft | 16 sq ft | 5.33 | 0.20 | 0.22 | 9 | 12 |
| 6 × 6 ft | 36 sq ft | 12.00 | 0.44 | 0.49 | 20 | 27 |
| 8 × 8 ft | 64 sq ft | 21.33 | 0.79 | 0.87 | 36 | 48 |
| 8 × 10 ft | 80 sq ft | 26.67 | 0.99 | 1.09 | 45 | 60 |
| 10 × 10 ft | 100 sq ft | 33.33 | 1.23 | 1.36 | 56 | 75 |
| 10 × 12 ft | 120 sq ft | 40.00 | 1.48 | 1.63 | 67 | 89 |
| 12 × 12 ft | 144 sq ft | 48.00 | 1.78 | 1.96 | 80 | 107 |
| 12 × 16 ft | 192 sq ft | 64.00 | 2.37 | 2.61 | 107 | 143 |
| 16 × 16 ft | 256 sq ft | 85.33 | 3.16 | 3.48 | 143 | 190 |
| 20 × 20 ft | 400 sq ft | 133.33 | 4.94 | 5.43 | 223 | 297 |
| 20 × 30 ft | 600 sq ft | 200.00 | 7.41 | 8.15 | 334 | 445 |
| 24 × 24 ft | 576 sq ft | 192.00 | 7.11 | 7.82 | 320 | 427 |
And the coverage table that goes with it — how far one yard, or one 80-lb bag, spreads at each thickness:
| Thickness | Sq ft one cubic yard covers | Sq ft one 80 lb bag covers |
|---|---|---|
| 3 in | 108 | 2.4 |
| 4 in | 81 | 1.8 |
| 5 in | 64.8 | 1.44 |
| 6 in | 54 | 1.2 |
| 8 in | 40.5 | 0.9 |
Quick answers for other slab sizes
How many bags of concrete do I need for an 8×8 slab?
At 4 inches thick, an 8 × 8 ft slab is 21.33 cu ft: 36 bags of 80-lb, 48 of 60-lb, or 72 of 40-lb mix.
How many bags do I need for a 12×16 slab?
At 4 inches thick: 64 cu ft — 107 bags of 80-lb, 143 of 60-lb, or 214 of 40-lb. In yards that is 2.37, so price the truck before buying the bags.
How many bags do I need for a 10×12 slab?
At 4 inches thick: 40 cu ft — 67 bags of 80-lb, 89 of 60-lb, or 134 of 40-lb.
How many bags do I need for a 24×24 slab?
At 4 inches thick: 192 cu ft — 320 bags of 80-lb, 427 of 60-lb, or 640 of 40-lb. Nobody mixes this by hand; it is 7.11 cubic yards, a full truckload.
Pallet counts: buying a yard at a time
Bagged concrete is sold off pallets, and a yard of it is conveniently close to one pallet. Typical manufacturer pallet quantities are 42 bags for 80-lb, 56 for 60-lb and 80 for 40-lb. So one cubic yard — 45 × 80-lb bags — is just over one pallet (45 ÷ 42 = 1.07 pallets); a yard of 60-lb bags is 60 ÷ 56 = 1.07 pallets; a yard of 40-lb bags is 90 ÷ 80 = 1.13 pallets. Stores will sell you the odd bags on top of a pallet, and a full pallet is often forklift-loaded straight into a truck or trailer — the easiest way to move a yard of bags ever invented.
Moving a yard of bags: the weight problem
The dry bags for one yard weigh 3,600 lb whichever size you choose — that is the number in the table above. Once mixed and placed, the same yard weighs about 4,050 lb, because the mixing water becomes part of the concrete (at the standard density of roughly 150 lb per cubic foot). For transport, plan on the dry figure: a half-ton pickup with a typical payload of 1,000–1,500 lb needs three trips for a yard of bags, while a pallet on a trailer or a store delivery handles it in one. However the bags arrive, stage them next to the mixer — carrying 45 bags twice is the mistake everyone makes once.
Worked example: ten fence post holes
Ten post holes, each 12 inches wide and 3 ft deep: one hole is π × 0.5² × 3 = 2.36 cu ft, so ten holes are 23.6 cu ft. In 80-lb bags that is 23.6 ÷ 0.6 = 40 bags (53 × 60-lb, 79 × 40-lb) — just under one pallet of 80-lb bags, roughly $200–$280 at the prices below, and a realistic one-day job for two people with a rented mixer. The same fence with twenty holes crosses into ready-mix territory on labour alone.
When bags beat ready-mix anyway
Bags win whenever the truck's fixed costs dominate: under roughly a quarter to half a cubic yard; where a truck cannot reach (a back garden with a narrow gate); for work spread over several weekends, where each small pour would carry its own short-load fee; and for repairs, where you need two bags, not two yards. The moment the job passes about half a yard in a single pour, price the truck — the crossover maths is in How Much Concrete Do I Need?, and our Bagged Concrete vs Ready-Mix guide runs the full head-to-head — labour, mixer hire and the exact point where the truck takes over.
Which bag size should you buy?
- 80-lb bags — cheapest per yard and fewest bags to carry, but each bag is heavy. Best when you have help or a wheelbarrow and mixer nearby.
- 60-lb bags — the middle ground most DIYers pick: noticeably easier to lift, only 15 extra bags per yard versus 80-lb.
- 40-lb bags — easiest to handle alone, but twice as many bags (90 per yard) and the most packaging to open. Good for post holes and small repairs, painful for a whole slab.
- Rule of thumb: if the job is under ~0.5 cubic yards (a few post holes, a small pad), bags make sense. Over that, a ready-mix truck is usually cheaper per yard and far less work — 45 × 80-lb bags is 1.8 tons of mixing by hand. See How Much Concrete Do I Need? for the full bags-vs-ready-mix decision.
What does a yard of bagged concrete cost?
Ready-mix is roughly $125–$180 per cubic yard (2026 US planning range, plus delivery and any short-load fee). The same yard in 80-lb bags is 45 bags at roughly $5–$7 each — about $225–$315 — before a mixer rental (~$50–$75/day). Bags cost roughly twice as much per yard as ready-mix, so they only win on small jobs where delivery fees would dominate. Get a local quote before ordering; prices vary a lot by region.
Common mistakes
- Forgetting waste. Spillage, uneven ground and form leaks eat 5–10%. A 10×10 slab needs 56 × 80-lb bags on paper but 62 with waste — buy the extra bags, not a second trip.
- Counting bags per yard from the wrong bag size. 45 is only true for 80-lb bags. With 60-lb bags it is 60, with 40-lb bags it is 90 — mixing the numbers up leaves you a third short.
- Ignoring the weight. One yard of bagged concrete is 3,600 lb to lift, carry and mix. A 10×10 slab at 4 inches is 56 × 80-lb bags — over 2 tons. Plan the mixer, the wheelbarrow route and the help before the bags arrive.
- Mixing brands mid-pour. Yields and set times differ slightly between brands. Use one brand for the whole pour so the slab cures evenly.
Frequently Asked Questions
How many 80-lb bags of concrete in a yard?
45 bags. One yard is 27 cu ft and one 80-lb bag makes 0.6 cu ft (27 ÷ 0.6 = 45).
How many 60-lb bags of concrete in a yard?
60 bags. One 60-lb bag makes 0.45 cu ft (27 ÷ 0.45 = 60).
How many bags for a 10×10 slab?
At 4 inches thick: 56 × 80-lb, 75 × 60-lb or 112 × 40-lb. With 10% waste: 62 × 80-lb, 82 × 60-lb or 123 × 40-lb. At 6 inches thick: 84 × 80-lb.
How many bags for one post hole?
A 12-inch-wide hole 3 ft deep is about 2.36 cu ft — 4 × 80-lb bags (6 × 60-lb, 8 × 40-lb).
Is it cheaper to buy bags or ready-mix?
For under ~0.5 cubic yards, bags. Above that, ready-mix is usually cheaper per yard — about $125–$180/yd versus $225–$315/yd in 80-lb bags — and far less labour.
Sources and Method
The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.
- QUIKRETE Concrete Mix No. 1101 data sheet (PDF) — yield per bag: 0.30 cu ft (40 lb), 0.375 cu ft (50 lb), 0.45 cu ft (60 lb), 0.60 cu ft (80 lb); mixing water about 6 pt per 80 lb bag. Checked November 2026.
- Sakrete published yield figures for high-strength concrete mix (cross-check).