How Much Gravel Do I Need for a Driveway?
A standard single-car driveway — 10 by 20 feet at 4 inches deep — takes 2.47 cubic yards of gravel, about 3.5 tons. Order 2.75 yards (4 tons) with waste. A brand-new driveway on bare ground needs about twice that: 6–8 inches built up in layers.
Checked and reviewed by Zia ur Rehman, site owner · Last reviewed: November 2026 · The formula is shown on this page and the sources behind the numbers are listed at the foot of the page.
The short answer
For a driveway you are resurfacing over a firm base, plan on 4 inches of gravel. At that depth, a single-car driveway of 10 × 20 ft takes 2.47 cubic yards — about 3.5 tons; order 2.75 yards (4 tons) once you add 10% for waste and uneven ground. A two-car driveway of 12 × 30 ft at the same depth takes 4.44 yards — about 6.2 tons; order 5 yards (7 tons).
A brand-new driveway on bare soil is a different job: it needs 6–8 inches of gravel in total, built up in layers, which roughly doubles the numbers above. A new 12 × 30 ft driveway at 8 inches takes 8.89 yards — about 12.4 tons; order 10 yards (14 tons).
The rest of this guide shows the working, so you can adjust it for any driveway size or depth — and the table below gives the buy figure for six common driveway sizes.
The formula
Gravel is sold two ways — by the cubic yard and by the ton — so the calculation has two steps: volume first, then weight.
- Volume: multiply the area in square feet by the depth in inches, then divide by 324. That gives cubic yards directly, because one cubic yard spread 1 inch deep covers 324 square feet.
- Weight: multiply cubic yards by about 1.4 tons per yard — the average density for gravel and crushed stone. Pea gravel is lighter (about 1.3 tons per yard) and dense crushed stone with fines is heavier (up to about 1.5).
- Round up, then add waste: add 10% for uneven ground, spillage and compaction, and round up to the next quarter yard or half ton. Suppliers deliver in whole or half tons and yards, so the final order is always the calculated figure rounded up — never down, because a thin final layer is where gravel jobs fail.
Use the Gravel Calculator for exact numbers on any driveway — the worked examples and table below cover the common ones.
How deep should gravel be?
Depth is the number that changes everything: doubling the depth doubles the gravel, the weight and the cost. Get the depth right for the job and the rest follows.
| Job | Depth | Notes |
|---|---|---|
| Garden path | 2–3 in | Light foot traffic only; 2 in is enough on firm, level ground. |
| Patio base | 2–3 in | A base under pavers or flagstones; compact it before laying the surface. |
| Driveway top-up / resurface | 3–4 in | Fresh stone over an existing firm driveway; 4 in is the standard finished depth. |
| Driveway on a firm base | 4 in | The common target for a residential driveway, normally placed as two compacted layers. |
| Brand-new driveway | 6–8 in total | Built in layers: 4 in of large stone at the bottom, then 2 in, then 2 in of finer stone on top. |
| Soft or clay ground | 8 in or more | Extra gravel poured into mud just sinks and mixes with the soil — stabilise the base first (landscape fabric and a thicker base layer) or the driveway will keep disappearing. |
Always order for the finished, compacted depth. Loose gravel compacts by roughly 10–20% once it is spread and driven on, so a layer that starts at 4 inches loose ends up nearer 3.5 inches — which is why the 10% waste allowance matters.
Worked examples
A 10 × 20 ft driveway, resurfaced at 4 inches. The area is 200 sq ft, so the volume is 200 × 4 ÷ 324 = 2.47 cubic yards. At 1.4 tons per yard that is 3.46 tons. Add 10% for waste and you order 2.75 yards (4 tons).
A 12 × 30 ft two-car driveway, resurfaced at 4 inches. The area is 360 sq ft, so the volume is 360 × 4 ÷ 324 = 4.44 cubic yards, or 6.22 tons. With 10% extra, order 5 yards (7 tons).
A brand-new 12 × 30 ft driveway at 8 inches total. The volume is 360 × 8 ÷ 324 = 8.89 cubic yards, or 12.44 tons. With 10% extra, order 10 yards (14 tons) — and order it as layers, not one load: 4 inches of large stone at the bottom (4.44 yards), then 2 inches in the middle (2.22 yards), then 2 inches of finer stone on top (2.22 yards). Each layer gets compacted before the next goes on, which is what stops the driveway rutting under tyres.
A long 10 × 50 ft driveway at 4 inches. The area is 500 sq ft, so the volume is 500 × 4 ÷ 324 = 6.17 cubic yards, or 8.64 tons. With 10% extra, order 7 yards (10 tons). At this size, check the delivery: a single dump truck typically carries 10–14 tons, so one load usually covers it.
Gravel needed by driveway size (4 inches deep)
For resurfacing over a firm base at the standard 4-inch depth. The "order" column already includes the 10% waste allowance, rounded up to the next quarter yard or half ton.
| Driveway size | Area | Cubic yards | Tons | Order (with 10% waste) |
|---|---|---|---|---|
| 10×20 ft (single car) | 200 sq ft | 2.47 | 3.46 | 2.75 yd³ / 4 tons |
| 12×25 ft | 300 sq ft | 3.70 | 5.19 | 4.25 yd³ / 6 tons |
| 12×30 ft (two cars) | 360 sq ft | 4.44 | 6.22 | 5 yd³ / 7 tons |
| 10×50 ft (long drive) | 500 sq ft | 6.17 | 8.64 | 7 yd³ / 10 tons |
| 12×40 ft | 480 sq ft | 5.93 | 8.30 | 6.75 yd³ / 9.5 tons |
| 20×30 ft (wide / double) | 600 sq ft | 7.41 | 10.37 | 8.25 yd³ / 11.5 tons |
For a brand-new driveway at 8 inches total, roughly double these figures — a 12×30 ft driveway needs 8.89 yards (12.44 tons) before waste, so order 10 yards (14 tons). See How to Calculate Cubic Yards for the same volume maths applied to mulch, topsoil and concrete.
Which gravel for a driveway?
Not all gravel behaves the same under tyres. The stone type changes the density — and whether the driveway stays put or migrates into the lawn:
- Crusher run / crush-and-run (best for driveways) — a mix of crushed stone and fine dust that locks together and packs hard when compacted, at about 1.4–1.5 tons per yard. Use it for the base and the middle layers, and for the top layer too if you want a firm, low-maintenance surface.
- #57 stone (¾–1 in, clean) — angular stone with no fines, so it drains well but does not pack as hard. Good for the base layer and for drainage areas, less good as a top layer on its own because tyres push it around.
- Pea gravel (⅜ in, rounded) — the lightest common option at about 1.3 tons per yard, and the prettiest, but the rounded stones roll under tyres and migrate off the driveway. Fine for paths and decorative beds; a poor choice for a driveway, especially on a slope.
- River rock — smooth and decorative like pea gravel, sold for beds and borders rather than driveways. It does not lock together at all.
For a driveway that gets driven on every day, the practical answer is crusher run: it is usually the cheapest option too, because it is a quarry product rather than a decorative one.
Bags or bulk?
Gravel in bags is only for very small jobs. One cubic yard of gravel weighs about 2,800 lb, which is 56 bags of 50 lb — so the 10 × 20 ft driveway above (2.47 yards) would take 138 bags. That is 3.5 tons to carry, open and spread by hand, and at roughly $4–$6 a bag it costs about $550–$830 — several times the bulk price. Buy bags only for a small top-up or a patch; anything the size of a driveway is a bulk delivery, ordered by the yard or the ton from a quarry or landscape supplier.
What does it cost? (2026, US, rough ranges)
Prices vary a lot by region and by stone type — treat these as planning numbers and get a local quote before ordering:
- Gravel / crushed stone: roughly $30–$60 per cubic yard (about $40–$85 per ton), plus delivery. The 10 × 20 ft driveway (2.75 yards ordered) is roughly $83–$165 of material; the new 12 × 30 ft driveway (10 yards) is roughly $300–$600.
- Delivery: many suppliers charge a flat delivery fee ($50–$100 is common) or waive it above a minimum order — always ask, because on a 2–3 yard order the fee can cost as much as the material. A single dump truck typically carries 10–14 tons, so a driveway up to about 10 tons is usually one load.
- Extras people forget: landscape fabric under a new driveway on soft ground, edging to hold the stone in, a plate compactor rental (roughly $50–$75/day) for the layers, and a wheelbarrow — moving several tons of stone by bucket is a long afternoon.
Want a hard surface instead of loose stone? A concrete driveway for the same 10 × 20 ft area is about 2.47 cubic yards of concrete at 4 inches — see How Much Concrete Do I Need? for the slab numbers and the bags-vs-ready-mix decision.
Common mistakes
- Ordering for the loose depth, not the finished depth. Gravel compacts by roughly 10–20% once spread and driven on. Order for the compacted depth you want, with the 10% waste allowance on top — otherwise the finished driveway ends up an inch thin.
- Ordering by tons without checking the density. A ton of pea gravel (1.3 t/yd³) is more volume than a ton of dense crusher run (1.5 t/yd³). If the supplier sells by the ton, confirm which stone and which density the price is based on — or order by the yard and let them convert.
- One thin layer on soft ground. Gravel poured onto mud sinks and mixes with the soil instead of forming a surface. On soft or clay ground, put landscape fabric down first and build the base thicker — extra stone poured into mud is money buried in the ground.
- Using pea gravel on a driveway. Rounded stones roll under tyres, migrate into the lawn and need constant raking back. Save pea gravel for paths and beds, and use angular crushed stone where cars drive.
- Skipping the layers on a new driveway. Dumping 8 inches of one stone size in a single load gives a soft, rutted surface. Build it in layers — large stone at the bottom, finer on top — compacting each one, and the driveway holds its shape for years.
Frequently Asked Questions
How many tons of gravel do I need for a driveway?
For a 10x20 ft single-car driveway at 4 inches deep: about 3.5 tons — order 4 tons with waste. A 12x30 ft two-car driveway at the same depth is about 6.2 tons — order 7 tons. A brand-new driveway at 8 inches total needs roughly double: a 12x30 ft driveway is about 12.4 tons, so order 14 tons.
How many cubic yards of gravel for a driveway?
A 10x20 ft driveway at 4 inches deep takes 2.47 cubic yards — order 2.75. A 12x30 ft driveway takes 4.44 yards — order 5. A long 10x50 ft driveway takes 6.17 yards — order 7. Use the Gravel Calculator for any other size.
How deep should gravel be on a driveway?
Four inches of finished, compacted depth is the common target for a residential driveway, normally placed as two compacted layers over a stable base. A brand-new driveway on bare soil needs 6–8 inches total, built in layers. Paths and patio bases are fine at 2–3 inches.
How much area does a ton of gravel cover?
About 58 square feet at 4 inches deep, 77 square feet at 3 inches, or 116 square feet at 2 inches, using the average 1.4 tons per cubic yard. These are planning figures — coverage shrinks on uneven ground where low spots swallow extra stone.
Is it cheaper to buy gravel by the ton or by the yard?
It is the same material priced two ways — convert with 1.4 tons per cubic yard and compare the delivered price. Watch the delivery fee and any minimum order: on a small order the fee can cost as much as the gravel, and a supplier selling by the ton may use a different density for pea gravel (1.3) than for crusher run (1.5), so confirm the stone before comparing.
Sources and Method
The constants and rules of thumb on this page come from the published references below. Where a figure is a range, the calculator uses the mid-range value and the text says so.
- ASTM D448 — standard classification of sizes of aggregate for road and bridge construction (gravel and crushed-stone size classes).
- Caterpillar Performance Handbook — published loose-density tables for gravel and crushed stone (about 1.25–1.5 tons per cubic yard).